Establish trunk lines first at coordinated elevations, maintaining straight runs that support stable static pressure. Place taps where branch transitions avoid structural webs and conduit racks. Confirm damper access and balancing ports before committing to hanger spacing. Model hanger locations, then verify field obstructions with quick laser checks. When trunks are true, branches naturally find space without kinks or awkward offsets. The result is smoother airflow, faster installation, and no backtracking to fix avoidable restrictions.
Return air paths demand generous space, especially near filters and fan access, so plan doors, access panels, and ladder reach before closing ceilings. Keep coil pull zones sacred, even when other trades push for inches. Confirm drain pans, traps, and clean-outs remain reachable. Label access sides for future technicians. Good serviceability prevents later ceiling demolition simply to change a part. Protecting maintainability up front is the quiet champion of truly rework-free installations over the building’s life.
Route condensate lines with slope confirmed in the model and checked on-site using laser levels and clear datums. Coordinate insulation thickness around tight beams and trays to keep finished dimensions honest. Maintain separation from energized equipment and protect below with drip shields where prudent. Test drains early to avoid surprises after finishes. Clear labeling, secure supports, and thoughtful fall directions transform a common leak source into a dependable, invisible system that never spoils ceilings or schedules.
Choose an appropriate detail level that includes hangers, sleeves, insulation, and access panels where they matter, not just pretty ducts and pipes. Model support types and real offsets to avoid last-minute guesswork. Insert no-go keep-out zones around doors, panels, and removable covers. Publish clash snapshots with clear ownership and due dates. When model elements mirror actual installation, crews spend time building, not translating. The ultimate test: field leads nod because drawings feel like reality.
Agree on who moves first when space tightens: gravity systems, then large ducts, then cable tray, then conduit, or another defined hierarchy. Document tolerances for offsets, slopes, and clearances so small conflicts do not escalate. Use weekly triage to burn down clashes, tracking reasons and responsible parties. Escalate immediately if changes ripple across multiple zones. Clear, shared rules take emotion out and put momentum in, preventing rework born from unclear expectations or wishful thinking.